Inspection Codes Guide

11  Building

  • 100  Footer
  • 405  Slab
  • 310  Vertical Cells/Columns
  • 305  Lintel/Tie Beam
  • 315  Masonry Wall Reinforcing
  • 120  Roof Decking
  • 125  Ext. Dry-In/In Progress
  • 127  Ext. Strapping/ Wall Sheathing
  • 130  Framing
  • 132  Rated Assembly Fastening
  • 135  Above Ceiling
  • 147 Rated Assembly/Penetration
  • 140  Insulation
  • 170  Zoning Final
  • 325  Lath/Stucco
  • 150  Fire Final (BLD)
  • 345  Mobile Home Tie Down
  • 340  Pool Steel & Ground
  • 100  Footer
  • 342  Pool Deck/Piping Pressure
  • 343  Pool Safety Check
  • 600  Final

12  Electrical

  • 341  Pool/Deck Bonding Insp. 
  • 350  Temporary Service
  • 351  Tug Inspection
  • 355  Underground/Slab
  • 200  Rough-In
  • 135  Above Ceiling
  • 199  Pre-Power
  • 112  Footer Steel & Grounding
  • 600  Final

13  Mechanical

  • 135  Above Ceiling
  • 200  Rough-In
  • 202  Framing/Fire Damper
  • 205  Kitchen Hood
  • 370  Pipe Pressure Test
  • 375  Refrigeration
  • 377  Light Test
  • 378  Performance Test  and Balance
  • 600  Final

14  Plumbing/Gas

  • 380  Underground Rough-In
  • 390  Sanitary
  • 010  Tub Set/Shower Pan
  • 230  Water Pipe
  • 240  Sewer
  • 242  Interceptor
  • 200  Rough-Gas
  • 250  Rain Leader
  • 199  Medical Gas
  • 600  Final

15  Swimming Pool

  • 435  Engineering Erosion Control/Silt Fence Inspection
  • 112  Electrical Pool Steel Grounding
  • 340  Building Pool Steel & Ground
  • 355  Electrical Underground
  • 341  Electrical Pool Deck/Bonding
  • 342  Building Pool Deck/Piping Pressure
  • 100  Building Footer
  • 343  Electrical Pool Safety Inspection
  • 343  Building Pool Safety Inspection
  • 600  Electrical Final
  • 435  Engineering Erosion Control/Silt Fence Inspection
  • 600  Engineering Final
  • 170  Building Zoning Final
  • 600  Building Final

16  Demolition

  • 525  Pre Demolition
  • 600  Final

17  Moving

  • 070  Site
  • 600  Final

18  Engineering

  • 262  Subbase/Base Inspection
  • 265  Paving Inspection
  • 270  Address Inspection
  • 272  Lamping Inspection
  • 275  Storm Sewer Inspection
  • 277  Sanitary Sewer Inspection
  • 280  Driveway Inspection
  • 290  Sidewalk/Ramp/Curb Inspection
  • 425  Mass Grading
  • 435  Erosion Control/Silt Fence
  • 600  Final Inspection

19  Fire

  • 450  Underground Main -Visual
  • 460  Underground Main-Flush
  • 470  Underground Main-Hydro
  • 440  Hydrant Flow Test
  • 475  Aboveground Sprinkler Visual (on site)
  • 480  Aboveground Hydro-Sprinkler
  • 410  Operational Test-Fire Pump
  • 400  Operational Test -Sprinkler/ Standpipe
  • 485  Sprinkler System Alteration
  • 430  Operational Test- Chemical/ Gaseous Agent
  • 490  Fuel Tank Installation
  • 420  Operational Test -Alarm System
  • 600  Final

20  Right-of-Way

  • 030  Open-Cut/Bore & Jack/Dir Drill
  • 040  Final
  • 050  Pre-Walk/WhiteLining